Supply Partners

Sika AG

About

Sika: Protecting the Structures That Make Europe’s Longest Rail Tunnels Possible

In tunnel construction, the work people notice is excavation: the breakthrough, the machinery, the kilometres completed. But the long-term value of a tunnel depends just as much on what happens after the rock is opened — how the structure is sealed, supported, protected and made durable enough to perform for decades.

That is where Sika AG brings real importance to projects such as the Brenner Base Tunnel.

Sika is a global specialist in bonding, sealing, damping, reinforcing and protecting structures across construction and industry. In tunnelling, its technologies support some of the most critical but often unseen parts of delivery: sprayed concrete, waterproofing, admixtures, drainage systems, repair mortars, injection systems and structural protection.

For the Brenner Base Tunnel, Sika has documented its role in providing a comprehensive sprayed-concrete solution for the intermediate construction site in Mauls. Its listed products include accelerators, superplasticizers, spraying equipment, fast-setting cement, epoxy resin, lubrication agents, drainage systems and repair mortar. Sika also notes that its support included on-site work for experiments, tests and quality control. Sika

That matters because a project like Brenner is not simply about creating an opening beneath the Alps. It is about creating a safe, durable and maintainable railway asset in a demanding underground environment. Concrete performance, water management, ground support, repair capability and quality control all influence how reliably the tunnel can move from construction into railway readiness.

Sika’s wider tunnelling portfolio includes waterproofing systems, concrete and spray-concrete admixtures, injection and bolting systems, repair and protection solutions, rail fixing and digital concrete monitoring tools. Sika

In that sense, Sika’s contribution sits inside the hidden engineering of the Brenner Base Tunnel: the materials and technical support that help protect the structure long after excavation is complete. For Europe’s freight future to move beneath the Alps, the tunnel must not only be built. It must be built to last.

 

Sika AG

Zugerstrasse 50

CH-6340 Baar (ZG)

Switzerland

Tel.:+41 58 436 6800



Make an Enquiry

1 + 2 = Solve this simple math problem and enter the result. E.g. for 1+3, enter 4.