Rhomberg Sersa Rail Group
About
Rhomberg Sersa Rail Group: Turning Tunnel Infrastructure into Railway Performance
The Brenner Base Tunnel is often described through excavation: rock removed, breakthroughs achieved and kilometres completed. But a tunnel only becomes useful when it is transformed into a working railway system. That is where Rhomberg Sersa Rail Group brings deep relevance.
As a leading European railway engineering and infrastructure group, Rhomberg Sersa specialises in track construction, slab track, railway technology, electric traction and complex rail infrastructure delivery. Its expertise sits exactly at the point where civil engineering becomes operational performance: the transition from a completed underground structure to a railway capable of carrying passengers and freight safely, reliably and at scale.
On the wider Brenner corridor, Rhomberg Sersa has already helped deliver critical access infrastructure. On Brenner Access North Lot A1, the company worked in consortium on a 41-kilometre high-speed line between Kundl/Radfeld and Baumkirchen, part of the northern access route to the Brenner Base Tunnel. The project included extensive tunnel works, slab track, cabling, fire-fighting systems, ventilation, noise protection and safety-related infrastructure. Rhomberg Sersa Rail Group | Global
On Brenner Access North Lot A2, Rhomberg Sersa Bahntechnik, together with Deutsche Bahnbau, served as general contractor for electrical and telecommunication infrastructure on the Lower Inn Valley line — another essential connection to the future Brenner Base Tunnel. Rhomberg Sersa Rail Group | Global
That experience matters because the Brenner Base Tunnel’s value depends on the full corridor, not the tunnel alone. Rail infrastructure has to be precise, durable, maintainable and interoperable. Track systems, power, telecoms, tunnel equipment and safety infrastructure all have to perform as one system.
For projects of this scale, Rhomberg Sersa’s role is not simply construction. It is railway readiness: helping create the conditions for cleaner freight, faster passenger movement and long-term corridor reliability beneath and beyond the Alps.


